Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Step 1. Deploy a VM

...

Step 2. Getting Started - Software Installation

Upgrade Path

Customers on version 9.5 will need to upgrade to 9.7 (Recommended U4 P3). Version 10 U2 P1 P2 migration is available from specifically 9.7 U4 P3.
Once the migration to v10 U2 P2 is complete. Customers are requested to upgrade to 10 U4 P2 immediately.

Existing Version

Upgrade Path

9.7 U4 P3 (Legacy)

Perform migration to 10.0 U2 P2

10.0 U2 P2

Upgrade to 10.0 U4 P2

10.0 U4 P2

No upgrade required

...

If you have the following time out issue when trying to pair to the site, Please make sure your local firewall device has not issue of passing packets with MTU size 1500 through the IPsec VPN tunnel. You can verify that by pinging the ZCC IP with command “ping -M do -s 1472 xx.xx.xx.xx“ from your local ZVM.

”pairing to site failed, timed out after attempting to connect to peer for 20 seconds”

Step 13. Setup Replication

...